91制片厂

Global Tenders

Tender Ref: MANPBT0014 DT.31.01.2025: Pre- bid tie up for EPC PACKAGE FOR DEVELOPMENT OF 100MW/400MWh BATTERY ENERGY STORAGE SYSTEM (BESS) AT BHEL/NTPC

February 04, 2025

罢别苍诲别谤听Ref:听MANPBT0014 DT.31.01.2025.

Last date / time of submission of Bids听听听听听听 听听听听: 10.02.2025 at 14.00 Hrs

Date / time of opening of Technical Bids听 听 听 听:听10.02.2025 at 14.30 Hrs

Your offer shall be submitted in line with our terms and conditions as per Tender. The tender can be downloaded from our website:听听听听听

Offer to be submitted thru email to email ids specified below only:-

PART-A (I) BID i.e. TECHNO卢COMMERCIAL BID on听technicalbid-epd@bhel.in听听:听听听听Duly filled & Signed听听

路听听听听听听听听听SCC MANPBT0014

路听听听听听听听听听Financial & Technical PQR along with supporting documents

路听听听听听听听听听Technical Specifications

路听听听听听听听听听Unpriced bid

路听听听听听听听听听GCC

路听听听听听听听听听Integrity Pact

路听听听听听听听听听GCC Annexure-I Undertaking of understanding the provisions of Tender,

路听听听听听听听听听GCC Annexure-II Deviation Sheet Cost of Withdrawal- Un-Priced Copy,

路听听听听听听听听听GCC Annexure-III Declaration of completeness of Offer,

路听听听听听听听听听GCC Annexure-XII Format for no deviation certificate

路听听听听听听听听听SCC Annexures-A, B, D,E, F

PART-B (II) BID i.e. PRICE BID on听pricebid-epd@bhel.in听听听听听:听听听听听听听听Duly filled & Signed听听听听听听听听听听听听听听听听听听听听听听听听

路听听听听听听听听听Price Bid form,

路听听听听听听听听听GCC Annexure-II Deviation Sheet_Cost of Withdrawal- Price Copy

1.听听Tender reference & due date to be mentioned in subject of mail.

2.听听Bidders may adopt this mode at their own risk. The Purchaser does not own any responsibility /liability for delays in receipt / loss of secrecy of such offers.

It shall be the responsibility of the bidder to ensure that the tender is submitted on or before the due date by听02:00 P.M.听The offer has to be听sent by e-mail听only.

For detailed instructions. Please refer to the tender documents.听

Kindly ensure single mail size should not exceed 20 MB and should be marked only to email ids mentioned above.

Bidders are requested to regularly visit听听and keep themselves updated about the Tenders/Corrigendum etc floated by BHEL.

In case you are unable to submit your offer for our tender, please submit the regret letter to this effect.

No-response to the tender shall be dealt according to BHEL SEARP guidelines in听.

Go to Navigation